|
Post by thermalwarrior on May 22, 2016 13:58:34 GMT
Just thought I would show how the restoration of my sons and my P5 is coming along. Our aim is to repair (where possible) rather than replace. I have started a group on facebook, showing the restoration progress (Slow but Sure) it is public. We have almost completed the RH side. Please have a look and tell me what you think whether good or bad, because it is the only way to learn. www.facebook.com/groups/917833651668516/?ref=bookmarks
|
|
|
Post by johnwp5bcoupe on May 22, 2016 16:18:58 GMT
Just thought I would show how the restoration of my sons and my P5 is coming along. Our aim is to repair (where possible) rather than replace. I have started a group on facebook, showing the restoration progress (Slow but Sure) it is public. We have almost completed the RH side. Please have a look and tell me what you think whether good or bad, because it is the only way to learn. www.facebook.com/groups/917833651668516/?ref=bookmarks I have been watching on Bookface Steve keep up the good work
|
|
|
Post by thermalwarrior on May 22, 2016 16:19:25 GMT
I have got the settings for public, I should of mentioned you do need a Facebook account. Sorry about that.
|
|
|
Post by thermalwarrior on Nov 23, 2016 19:59:09 GMT
We are progressing well, we have completed the Right Hand Side and have just welded an Inner sill and sill divider on the left hand side. The Out rigger, which is bolted to the Front Sub Frame also needs replacing. This is where I need a bit of help. I have purchased a Wadhams repair part, but it does not come pre drilled. I have taken measurements from the old part (which is still in situ) but just need help from someone in what their measurements are, just for peace of mind/ and for confirmation. Thank You I am attaching a photo I hope wozzer does not mind.
|
|